高峰水库下采空区重大安全风险评估及治理对策

         

摘要

After the closing of Shexingping mining area in ShiZhuYuan ( SZY) Multi-metal Mine, the abandoned mining area has been submerged by the water of GaoFeng Reservoir .So the goafs full of water below GaoFeng Res-ervoir have became the hazard for the remaining area of SZY .However , the safety pillar under the reservoir has been destroyed by illegal mines , and things are getting even worse .To eliminate this hazard , based on the fluid-solid coupling equation of finite difference method , numerical simulation was used to access the stability of water-proof pillar and 53#goaf.Furthermore, 104 events which might trigger water inrush accidents were found out by qualitative fault tree analysis method .The risk level of water inrush was analyzed , and some countermeasures were put forward , and this case could be a successful experience for mining underwater body .%湖南柿竹园多金属矿老蛇形坪矿区闭坑后被高峰水库淹没,周边民采矿点超深越界偷采井下保水矿柱,形成了高峰水库下积水采空区透水隐患。为了保证临近矿区安全开采,消除采空区透水隐患,在三维流固耦合有限差分数值模拟的基础上,对53#关键采空区和18m隔水矿柱的稳定性进行了分析,采用事故树法排查了可能发生出突水事故的104种基本事件,分析了高峰水库重大安全隐患的风险等级,并提出了隐患治理对策,可为水下开采的矿山突水安全评估及治理提供参考。

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号