首页> 中文期刊> 《地震学报:英文版》 >Resource management and job scheduling of China earthquake grid experiment system: Construction of resource management and job dynamic scheduling model ProRMJS

Resource management and job scheduling of China earthquake grid experiment system: Construction of resource management and job dynamic scheduling model ProRMJS

         

摘要

Grid technique is taken as the third generation internet technology and resource management is the core of it. Aiming at the problems of resource management of CEDAGrid (China Earthquake Disaster Alleviation and Simu-lation Grid) in its preliminary construction, this paper presents a resource management and job scheduling model: ProRMJS to solve these problems. For platform supposed agreeably each computing node can provide computa-tion service, ProRMJS uses “computation pool” to support scheduler, and then the scheduler allocates jobs dy-namically according to computing capability and status of each node to ensure the stability of the platform. At the same time, ProRMJS monitors the status of job on each node and sets a time threshold to manage the job schedul-ing. By estimating the computing capability of each node, ProRMJS allocates jobs on demand to solve the problem of supposing each node can finish the job acquiescently. When calculating the computing capability of each node, ProRMJS allows for the various factors that affect the computing capability and then the efficiency of the platform is improved. Finally the validity of the model is verified by an example.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号