首页> 中文期刊> 《唐山学院学报》 >基于模糊综合评价法的PPP模式风险管理模型构建

基于模糊综合评价法的PPP模式风险管理模型构建

         

摘要

In the use of PPP model for the proj ect investment,it is necessary to give full attention to the risks in the process of PPP proj ect.In this paper,the authors classify the potential risk factors in PPP proj ects into two levels of indicators.The first-level indicators include political risks,construction risks,interest risks,legal and contract risks,and management risks and the second-level indicators embrace interest risks,deficient legal and regulatory systems and 1 5 oth-ers.The authors quantify the PPP risk factors with the fuzzy comprehensive evaluation method, construct the model of risk management function,and determine the risk level to strengthen the management of the PPP risks.%在运用PPP 模式进行项目投资时,需对PPP 项目进程中的各种风险给予充分重视。文章将潜在性质的PPP项目风险因素分为一级指标和二级指标,一级指标包括政治风险、建设风险、利率风险、法律与合同风险、经营风险5项指标;二级指标包括利率风险、法律及监管体系不完善等17项指标,通过模糊综合评价法对PPP模式的风险因子进行量化,从而构建风险管理功能模型,最后确定风险等级,以加强对PPP模式风险的管理。

著录项

  • 来源
    《唐山学院学报》 |2016年第3期|84-87|共4页
  • 作者

    秦腾; 何叶荣; 白林;

  • 作者单位

    淮南师范学院 经济与管理学院;

    安徽 淮南 232038;

    淮南师范学院 经济与管理学院;

    安徽 淮南 232038;

    安徽理工大学 能源与安全学院;

    安徽 淮南 232001;

    淮南师范学院 经济与管理学院;

    安徽 淮南 232038;

    安徽省资源型城市发展研究中心;

    安徽 淮南 232038;

  • 原文格式 PDF
  • 正文语种 chi
  • 中图分类 F272.35;
  • 关键词

    模糊综合评价; PPP模式; 风险管理模型;

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号