邯钢新区回收了2×360m2烧结机机尾余热烟气,共配置2套余热锅炉,产生中压蒸汽并入原30 MW烧结余热发电中压蒸汽母管,以实现能源循环利用,提高现有烧结余热发电机组的利用效率,提高企业经济效益。%The tail flue gas waste heat of 2í360m2 sintering machines has been recov-ered in the newly-built area of Handan Iron & Steel Group Co., Ltd. Two sets of waste heat boiler are configurated. The produced medium pressure steam is incorporated into the medium pressure steam pipe of the original 30 mw sintering waste heat power generation so as to achieve energy recycling, to increase utilization efficiency of the existing sintering waste heat power generation units, and to improve enterprise economic benefits.
展开▼