首页> 中文期刊> 《建井技术》 >西部侏罗系深基岩立井冻结温度场实测与分析

西部侏罗系深基岩立井冻结温度场实测与分析

         

摘要

为掌握西部侏罗系地层深基岩立井冻结温度场发展规律,根据新街矿区红庆河煤矿二号风井井壁厚度及混凝土强度等级的不同,布设各监测水平,对冻结法凿井期间井壁与冻结壁温度进行现场实测,得到了该地区在特定条件下的温度场变化规律。结果表明,壁座大体积 C70混凝土浇筑后,30~36 h 内水化热达到峰值,测到的最高温度为71.32℃,升温速率基本为40℃/d ,降温速率为4℃/d 左右。外壁温度变化可分为3个阶段,即线性急速上升阶段、非线性快速下降阶段和趋于稳定阶段。混凝土配合比决定了水化热的升温强度,井壁厚度决定了水化反应的时间跨度。%To master the development law of freezing temperature field of shaft in western Jurassic stra ‐tum deep bedrock , according to the thickness of shaft liners and the different grade of concrete strength of Hongqinghe Coal Mine No.2 air shaft in Xinjie Mining Area ,monitoring and measuring levels were set and a site measurement study was conducted on the temperature of the shaft liner and the freezing wall during freeze sinking ,temperature field variation law of the region in certain freezing conditions was obtained. The results indicate that the heat of hydration of the C 70 mass concrete in shaft crib points reaching the maximum of 71.32 ℃ within 30 ~ 36 h ,the heating rate is about 40 ℃ /h and the cooling rate is around 4 ℃ /d. The temperature variation of the external shaft liner would have three stages and they were a linear rapid increasing stage ,nonlinear rapid decreasing stage and stable stage. The concrete mix determines the heating degree of hydration heat and the thickness of shaft lin‐er determines the time span of hydration heat.

著录项

  • 来源
    《建井技术》 |2015年第2期|32-35|共4页
  • 作者单位

    内蒙古伊泰集团有限公司;

    内蒙古 鄂尔多斯 017000;

    内蒙古伊泰广联煤化有限责任公司 红庆河煤矿;

    内蒙古 鄂尔多斯 017200;

    内蒙古伊泰广联煤化有限责任公司 红庆河煤矿;

    内蒙古 鄂尔多斯 017200;

    天地科技建井研究院;

    北京 100013;

    煤矿深井建设技术国家工程实验室;

    北京 100013;

    内蒙古伊泰广联煤化有限责任公司 红庆河煤矿;

    内蒙古 鄂尔多斯 017200;

  • 原文格式 PDF
  • 正文语种 chi
  • 中图分类 TD265.3+4;
  • 关键词

    侏罗系地层; 深基岩; 冻结法; 冻结温度场; 大体积混凝土;

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号