Progress of CSRm Vacuum System in 2004

         

摘要

Great progress was achieved in CSRm vacuum system in the year of 2004. All of the components have been fixed to the system. After mechanic adjustment, baking-out on line, average vacuum degree of CSRm was up to better than 5×10-10 Pa. In this paper, the mechanic installation and adjustment, fix of baking system, process of pumping and result are introduced.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号