In view of the present situation of water injection development in heavy oil H oilfield is difficult to improve the recovery rate,the feasibility of chemical flooding is demonstrated by means of numerical model,material model and combined field experience.%针对普通稠油H油田注水开发难以进一步提高采收率的现状,通过数模、物模研究,结合矿场经验,从油藏条件、注采能力及驱油效果等方面论证了普通稠油油藏化学驱可行性,为该类油藏转换开发方式指明了方向.
展开▼