首页> 中文期刊> 《铁道标准设计》 >高速铁路CRTSⅢ型先张轨道板质量控制关键技术探讨

高速铁路CRTSⅢ型先张轨道板质量控制关键技术探讨

         

摘要

The concept of“Uniformity is controlled by initial stressing, and total stressing is controlled by final stressing” is brought forward based on test analysis of the stress force of a single pre-stressed bar after double directional initial stressing and final stressing of CRTS III track slab. The analysis results show that the allowance of initial stressing shall be controlled within 3 kN, and the combination of matching grain of cementing material with reactive excitation for early demoulding is proposed. To minimize laitance on base board and achieve appropriate amount of aggregate naturally exposed. such measures as cutting down concrete slum and multi-layer concreting are suggested.%通过对高速铁路CRTSⅢ型双向先张预应力轨道板初张拉和终张拉过程完成后单根预应力筋张拉力的测试分析,提出“初张拉控制均匀性、终张拉控制总张拉力”的控制理念,并提出初张拉力值偏差应控制在3 kN以内。针对轨道板早期脱模特点,提出胶凝材料粒度匹配和活性激发技术;为减少板底浮浆、实现骨料适量自然外露,提出减小混凝土坍落度、多层连续浇筑的技术措施。

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号