According to the hazards of the slip models in the traditional decreasing-modelling process of the overall construction,the paper points out the replacement of the manual operation with the electric integral system by shifting the operation platform to the outside of the storage to identify whether the stressed points of the sensor monitoring,and it adopts the computer analysis to realize the real-time inspection,alerting,troubleshooting and control by shifting the communication cables to the integral controller,so as to ensure the safety of the platform and save cost.%针对滑模工程在主体施工完传统降模过程中存在的安全隐患,提出了电动集成系统代替人工操作,将操作平台转移至仓外,传感器监测各个受力点是否均匀,并将数据通过通讯电缆传至集成控制器,利用电脑分析,实现了实时监测、报警、排障和控制,确保了降平台的安全性,节约了成本.
展开▼