From the surface cleaning,measurement lining,reinforcement construction,module installation,and concrete construction,the paper illustrates the construction technique for the dam anti-seepage plate in water conservancy projects,and explores the anti-crack scheme for the anti-seepage surface plate,so as to prolong the durability of dams.%从表面清理、测量放线、钢筋施工、模板安装、混凝土施工等方面,阐述了水利工程中大坝防渗面板的施工技术,并探讨了防渗面板的抗裂方案,旨在延长大坝的使用寿命。