By subway foundation engineering certain instances,through self-balancing static load test on-site inspection and laboratory tests com-bining a comprehensive analysis of the bearing capacity of the rock under complicated geological conditions values. Under complicated geological conditions of rock-socketed pile capacity calculation method provides a reference.%以某地铁地基工程为例,通过自平衡静载试验现场检测与室内试验相结合的方法,综合分析了复杂地质条件下岩石承载力的取值问题,为复杂地质条件下嵌岩桩承载力计算方法提供参考。
展开▼