结合工程实例,通过研究大型地下水封洞库群的施工特点,提出了机械化配置要求,分析了机械化配套施工的优越性,并根据机械化配置原则,给出了大型地下水封洞库机械配套组合。%Combining with engineering examples,the paper points out the mechanized allocation requirements according to the construction fea-tures of large-scale underground cavern groups with water curtains,analyzes the advantages of the mechanized auxiliary construction,provides the mechanic auxiliary combination of the large-scale underground cavern groups with water curtains adhering to the mechanized allocation principle.
展开▼