以田庄暗渠工程为例,根据监测目的及监测点布设要求,制定了垂直位移及水平位移监测方案,并结合施工进度情况,对其监测频率进行了确定,以提高观测精度,从而确保工程的顺利进行。%Taking the Tianzhuang culvert engineering as an example,according to the monitoring purpose and monitoring points layout,made the horizontal displacement and vertical displacement monitoring scheme,and connecting with the construction progress,determined its monitoring frequency,in order to improve the observation accuracy,so as to ensure the smoothly construction.
展开▼