Through the analysis on the cable-stayed bridge structure principle,introduced the construction technology to tall cantilever beam con-struction,solved the problems of tall cantilever beam construction erecting scaffold,provided a new construction method for tall cantilever beam operation.%通过对斜拉桥结构原理的分析,在高大悬挑梁施工上引入该施工工艺,解决了高大悬挑梁施工搭设脚手架的困难,为高大框架作业提出了一种新的施工方法。
展开▼