为了更有效地治理滑坡,以青藏高原东部的实际工程案例为例,介绍了滑坡的工程概况、环境地质条件,分析了滑坡的影响因素,提出了桩板墙+抗滑桩锚索防护及桩板墙+框架梁锚索两种防护方案,推荐采用桩板墙+框架梁锚索防护方案。%In order to more effective management of landslide, in the eastern part of the Qinghai-Tibet Plateau of the actual engineering case as an example, introduces the general situation of the engineering landslide, the environmental geological conditions. Put forward the sheet pile and frame beam anchor pile, anchor cable protection and sheet pile two protection schemes. Sheet pile and frame beam is recommended for the anchor cable protection scheme.