Taking Singapore·Nanjing ecological technology island project as an example,introduces the plane and vertical section design situa-tion of the comprehensive pipe corridors,illustrates the grouting sequence of the main structure and its construction craft,and explores the techni-cal points for the reinforcement construction,model construction and concrete construction,so as to provide some reference for similar projects.%以新加坡·南京生态科技岛工程为例,论述了市政综合管廊的平面及纵断面设计概况,阐述了管廊主体结构的浇筑顺序及施工工艺流程,提出了钢筋施工、模板施工、混凝土施工的技术要点,为其他类似项目的施工提供借鉴。
展开▼