The paper analyzes the action mechanism of CFG pile+crushed-stone-pile composite foundation. Combining with engineering exam-ples,it introduces preliminary estimation methods,discusses construction technologies and control measures of combined composite foundation, and finally points out:the above-mentioned foundation treatment both improves the bearing capacity and eliminates liquefaction.%分析了CFG桩+碎石桩组合型复合地基的作用机理,结合工程实例介绍了初步设计估算方法,论述了组合型复合地基的施工工艺和控制措施,指出这种地基处理方法提高了承载力,消除了液化作用。
展开▼