Taking integral Yangze river bridge design in Rugao as an example,the paper introduces design points of the bridge tower,major beam and inclined cable and other parts. Starting from aspects of major tower cushion cap foundation,major tower,major beam and construction moni-toring,it summarizes operation points in bridge construction process,and points out that:all indicators of bridge built meet design and norms de-mands.%以如皋长江大桥的总体设计为例,介绍了该桥桥塔、主梁、斜拉索等设计要点,并从主墩承台基础、主塔、主梁、施工监控等方面入手,对桥梁施工过程中的操作要点进行了总结,指出该桥建成后各项指标均满足设计与规范要求。
展开▼