According to the analysis of the technical points for the relocation of the printing center of newspaper group,the paper illustrates the reasons for the site allocation,indicates the reasons for the mutual independence between the equipment structures and workshops by combining with the production procedure of newspaper and identifying the equipment sequences,and promotes the effectiveness and safety of the whole pro-duction system by a series of measures.%通过对报业集团印务中心外迁项目设计技术要点的分析,阐述了场地的布置原则,结合报纸的生产工艺流程,明确了设备排列要解决的问题,说明设备结构与厂房结构相互独立原因,通过一系列技术措施,提升了整个生产体系的有效性及安全性。
展开▼