为了满足建设项目特殊条件施工要求,项目技术部根据工程特点和经验,经多方调研比对,在某钢厂1549 mm 热连轧主轧线3号卷取机基础在线改造拆除中采用新的设备基础绳锯拆除方法,并在拆除过程中检查和监督,最终顺利完成目标,确保了工程的进度和质量。%In order to meet special construction project demands,according to engineering features and experience,based on survey and compar-ison,the paper applies new equipment foundation wire saw cutting method in 1 549 mm heat-connection rolling line No. 3 coiling machine trans-formation,and carries out examination and supervision in removal process,finally successfully achieves the goal and guarantees the engineering schedule and quality.