从适用性与可操作性的角度出发,探讨了网络计划与偏差分析在进度控制中的应用技巧,论述了网络计划方法的基本原理及其从计划到实施、检查到改进所进行的动态控制,指出工程网络计划的方法有利于实现进度控制的科学化。%Starting from aspects of applicability and operability,the thesis explores the application techniques of network planning and deviation analysis in schedule control,discusses its basic principles and dynamic control from planning to implementation,examination and improvement, and finally points out that:engineering network planning method will be good for realizing schedule control scientific.
展开▼