结合临离高速公路路基十六分部工程情况,对预应力筋盖梁施工技术进行了分析,着重对人员安排、机械设备配备、材料选用、施工方案和施工方法等环节进行了详细阐述,并制定了施工质量保证体系及控制措施,为预应力筋盖梁的施工积累了经验。%Combining with Lin-Li highway subgrade 16th branch engineering conditions, the paper analyzes prestressing tendons capping beam construction technology, specifically describes staff arrangement, machinery equipment distribution, material selection, construction scheme and construction methods, and formulates construction quality guarantee system and control measures, which has accumulated experience for pres-tressing capping beam construction.
展开▼