According to pumped-storage power station engineering features including various hubs, wide scope and mountainous geological envi-ronment, the paper briefly analyzes construction land geology risk estimation level and field separation, describes its geological hazard estimation status, prediction estimation and comprehensive separation estimation, and finally discusses current survey points, report compilation and bad geological phenomena and other technical problems, with a view to provide some guidance.%针对抽水蓄能电站工程包含工程枢纽多、涉及范围广,工程所处山区地质环境条件复杂的特点,对该类项目建设用地地质灾害危险性评估的评估级别、评估范围和场地分区进行了简要分析,阐述了其地质灾害危险性现状评估、预测评估、综合分区评估的要点,并对现状调查重点、报告编制、不良地质现象等技术问题进行了评述,以供参考。
展开▼