以某火电厂施工项目为例,论述了火电厂整个施工测量作业过程,分别从施工测量作业、沉降观测与变形监测等方面提出了测量过程的控制要点,为提高施工测量精度提供了保障。%Taking the construction project of thermal power plant, the paper discusses overall construction survey process of thermal power plant, and respectively survey process controlling points from aspects for construction survey, settlement observation, and deformation inspection and so on, which has provided guarantee for improving construction survey accuracy.
展开▼