通过对影响工程项目建设的进度因素进行归类分析,进而提出一些解决的办法或建议,为施工单位在保证工程项目满足质量要求的前提下,以最少的工期完成该工程项目。%Through the classification analysis on schedule factors affected the engineering project construction, and then put forward some solutions and suggestions, for the construction unit in premise of ensuring the engineering project to meet the quality requirements, with minimal time to complete the engineering project.