针对PCCP混凝土钢筒管安装施工方案在西范一级泵站更新改造工程2009年度新增项目中的应用进行了介绍,重点对管子运输到安装进行了系统的论述,可为其他类似工程提供指导。%The paper introduces the installation construction scheme of PCCP concrete cylinder pipe at the renewal and reconstruction project of Xifan 1st stage pumping station,the new program in 2009,and has the systematic illustration on the process from the pipe transportation to the installation,so as to provide the direction for other similar projects.