首页> 中文期刊>山西建筑 >川气东送管道青弋江爬堤开挖穿越方案报建技巧

川气东送管道青弋江爬堤开挖穿越方案报建技巧

     

摘要

The paper introduces the local report skills of the pipeline project of natural gas transmitting from Sichuan to East before the climbing embankment's excavation and directional drilling during the main flood season of Qingyi River,illustrates the ideas,the ways,and the methods for the local reports of the excavation and directional drilling of Qingyi River climbing embankment during the main flood season,analyzes the features of the local reports during the main flood season,and introduces the coping strategies and the implementation effect of the strategies,so as to direct the reports in similar programs in future.%详细介绍了川气东送管道工程在青弋江主汛期进行爬堤开挖穿越前地方报建的技巧,重点阐述了青弋江爬堤开挖穿越主汛期地方报建的思路、方式和方法,分析了主汛期地方报建的特点,介绍了应对策略及策略实施效果,以指导今后同类项目报建工作。

著录项

  • 来源
    《山西建筑》|2012年第13期|277-279|共3页
  • 作者

    侯海军; 李玮; 耿云鹏;

  • 作者单位

    中国石化集团管道储运公司华东管道设计研究院,江苏徐州221008;

    中国石化集团管道储运公司华东管道设计研究院,江苏徐州221008;

    中国石化集团管道储运公司储备油库管理处,江苏徐州221008;

  • 原文格式 PDF
  • 正文语种 chi
  • 中图分类 气体管道;
  • 关键词

    管道工程; 地方报建; 技巧;

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号