为了有效地控制工程造价,让学校有限的资金发挥出最大的经济效益,从设计阶段、施工阶段、竣工结算三个阶段论述了工程造价的控制措施,以期提高经济效益,保证工程顺利进行。%In order to effectively control engineering cost and to play maximum economic role of limited funds of the college, the paper discusses engineering cost controlling measures from design phase, construction phase and completion phase, with a view to improve economic benefits and to ensure the engineering smooth.
展开▼