首页> 中文期刊> 《山西建筑》 >宝塔山隧道出口浅埋段施工方案

宝塔山隧道出口浅埋段施工方案

         

摘要

Combining with the construction at Baotashan Tunnel of Pingyao-Yushe section along Fenyang-Xingtai expressway, the study introduces some key construction techniques, such as the tunneling construction, the slope protection, the pipe roof grouting and consolidating construction and its construction method, the tunnel excavation method and craft, the construction craft for section steel frame, and shorerete-bolt support, so as to accumulate precious experience for similar tunnel construction.%结合汾阳至邢台高速公路平遥—榆社段宝塔山隧道的施工,介绍了隧道施工中进洞施工及边坡防护、管棚注浆加固施工与施工方法、洞身开挖工艺和方法、型钢钢架施工工艺、喷锚支护等关键施工技术,为类似隧道施工积累了宝贵经验。

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号