Taking Tianjin connection pipe production workshop for the engineering background, this paper introduced in detail the application of derivating transfer column crane load using PKPM 3D modeling and matters need attention in derivation process, gained relevant experience, provided guidance for designers.%以天津市联通钢管生产车间为工程背景,详细介绍了利用PKPM三维建模简便准确导算抽柱吊车荷载的应用及导算过程中注意的事项;得到相关经验,为设计人员提供指导。
展开▼