Combining with the engineering survey, the paper introduces the construction and the inspection methods for the Kuiqi No. 2 small- spacing tunnel with super-large section of and has the brief analysis of the construction and the inspection technique for the small-spacing tunnel with the super-large section in the joint rock masses, so as to provide some reference for some similar projects.%结合工程概况,对魁岐2号特大断面小间距隧道工程的施工和监测方法进行了介绍,对节理岩体中特大断面小间距隧道的施工和监测技术进行简要分析,以供类似工程借鉴和参考。
展开▼