为了评估某地块建设对无锡轨道交通3号线施工的影响,采用MIDAS/GTS400软件进行了建模分析,并模拟了该地块施工的全过程,计算结果表明,该地块对无锡轨道交通3号线工程的安全性影响在可控范围内。%In order to assess the impact of the land construction upon Wuxi subway No.3 line engineering,the paper carries out modeling analysis by using MIDAS/GTS400 software,and simulates the whole land construction process.The calculation results show that the security impact of the land construction upon Wuxi subway No.3 line engineering is within the control scope.
展开▼