针对翼侯高速白驹一号大桥3号墩桩基开挖施工进行了详细介绍,分别阐述了施工前准备工作,施工组织计划,施工控制措施三方面内容,为今后同类项目施工提供一定指导。%The paper introduces the pile foundation excavation of No.3 pier at Baiju No.1 Bridge along Yicheng-Houma Expressway,illustrates the preparation before the construction,the construction organization plan,and the construction control measures,so as to provide some direction for similar programs in future.
展开▼