According to the previous engineering experience,the paper analyzes some problems in the installation process of the steel structure workhouses,explores the reasons for the quality hidden hazards,and points out respective prevention measures,so as to direct the practice and to ensure the construction quality and to meet the respective prevention measures.%根据以往工程经验,针对钢结构厂房在安装过程中发现的一些问题进行了分析,探讨了质量隐患产生的原因,并提出相应的防治措施,以指导实践,保证施工质量最终能满足相应的规范要求。
展开▼