Combining with the No. 0 construction at the continuous beam on Dongfengqu Bridge along Lingqiu-Hequ expressway, the paper introduces the stressed calculation methods for the grouting of the continuous beam bridge of the steel pipe support, and points out the stress of the structure is identical and reasonable and adheres to the construction requirements by the calculation, so as to accumulate better experience data for similar projects.%结合灵河高速东风渠大桥连续梁0号块施工实例,介绍了钢管支架在连续梁桥现浇中的受力计算方法,通过计算指出该结构受力明确合理,符合施工要求,为以后的类似工程施工积累了良好的经验数据。
展开▼