结合自身工作经验,探讨了监理人员在现场对节能工程的事前控制、事中控制、事后验收等各个环节的控制、检查要点,并提出监理过程中的注意事项,以确保高层建筑节能工程施工质量。%Combining with self working experience, the paper explores the how to control energy-saving engineering for supervisors at stages of prior control, process control and subsequent check and acceptance and other points, and puts forward matters needing attention in supervision process, with a view to ensure the high-rise energy-saving engineering construction quality.
展开▼