首页> 中文期刊> 《山西建筑》 >浅谈某水电站厂区枢纽布置

浅谈某水电站厂区枢纽布置

         

摘要

According to in-situ natural condition of the hydropower station engineering in Sichuan province, combining with relevant norms, it introduces two kinds of different plant arrangement schemes. Through comparing impacts of different power generating hydraulic head on hydraulic station power generating quantity and economic indicator, it finally determines the plant hub arrangement scheme, which has certain guiding significance for future similar hydropower station plant planning.%根据四川省某水电站工程现场自然条件,结合相关规范,介绍了两种不同的厂区布置方案,并通过比较不同发电水头对水电站发电量及经济指标的影响,确定了厂区枢纽布置方案,对今后同类水电站厂区规划具有一定指导意义。

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号