Taking government investing project engineering as the research object, it inquires engineering cost management measures at construction phase, respectively describes cost controlling points from four aspects of engineering quantity and payment, engineering change and changing price adjustment, engineering claim, and engineering settlement and check, with a view to guide practice and to achieve the goal of reduce engi- neering cost.%以政府投资项目工程为研究对象,探讨了施工阶段工程造价管理措施,分别对工程计量与支付,工程变更及变更价款调整、工程索赔、工程结算审核四方面的造价控制要点进行了阐述,以指导实践,达到降低工程造价的目的。
展开▼