The paper introduces the implementation process for the smooth production and speedy reaching productivity for the No. 6 blast furnace in ironmaking piant of Linfen, ensures the continuous drying oven and guarantees the reasonability of the two airy flows of four systems of the blast furnace by using the large air flow to dry ovens, the scientific control over industrial water pressure, the loading with air blast and reason- abler organization of smelting iroh, so as to make the blast furnace to have smooth production and realize the speedy productivity.%详细介绍了临钢六号高炉的顺利开炉与快速达产的实施过程,通过使用大风量烘炉,科学控制工业水压,实行带风装料,合理组织出铁等一系列有效的创新手段,确保了高炉连续性烘炉,保证了高炉四大制度两大气流的合理性,使得高炉顺利开炉,实现快速达产。
展开▼