Insurance ratemaking method for risk of construction diversion project

         

摘要

Based on analyzing risk factors of diversion project,synthetic risk rate and engineering insurance period,the frequency and distribution law of loss are researched on the grounds that foundation pit is submerged after diversion project ceases to be effective.And then,the standpoint that these total loss is subject to non-homogeneous compound Poisson processes is put forward.Furthermore,the collective risk model of the total loss about engineering insurance is established on the basis of construction diversion project risk.Ultimately,insurance ratemaking method for construction engineering risk and its mathematical expression are presented,which provides theoretical method for the insurance ratemaking of hydropower engineering to some extent.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号