临时改绞在满足安全生产和施工要求的前提下,积极推广应用新技术、新工艺、新设备,优化施工方案,提高机械化水平,尽可能利用原一期装备的设施和材料,以减少改绞工作量缩短改绞时间,节约改绞投资成本.改绞后形成临时提升、压风、供风、供水、通风、供电、通讯及地面运输等系统.%For temporary reequipping, on the basis of meeting the safety production and construction requirements, we should actively promote the use of new technologies, new processes and new equipment, optimize construction programs, improve the level of mechanization, use the original equipment and materials as far as possible to reduce workload and save the cost. After reequipping, temporary hoisting, pressure air, wind, water, ventilation, electricity, communications and ground transportation systems are formed.