Combined with the specific project requirements, this paper analyzes the technical requirements, technical measures, error, elevation and other control measures of through survey of deep mine, in order to provide more reference value for similar projects.%本文将结合具体测量项目,深入分析深井矿山贯通测量的技术要求、技术措施以及误差、高程等工艺参数的控制措施,以期为同类项目提供更多具有参考价值的实践资料.
展开▼