本文结合实际工程,对多平衡顶管机大直径长距离顶进施工技术进行研究,并重点论述顶管施工方式的确定、顶管机和配套辅助设备的选择方法.%Combining with practical engineering, to study long distance and large diameter jacking construction technology of the multi-balance pipe jacking machine, and to focus on the determination of the pipe jacking construction mode and the selection method of pipe jacking machine and other auxiliary equipment.
展开▼