Based on a case study of dismantling breakwater roundhead for a breakwater extension project, this paper presents the value engineering transferred from the claim caused by construction quantity deviation, and comprehensively reviews the understanding and application of value engineering in FIDIC contract condition, for reference of similar projects.%本文依托某防波堤扩建项目中原堤头拆除的案例,将因工程量变更引起的索赔转化为价值工程,并结合价值工程的广义概念对FIDIC合同条件下价值工程的理解及实践进行探讨,为类似工程提供借鉴参考.
展开▼