通过对基坑降水、废水及雨水回收的多重利用,以及在施工过程中对水资源使用的精益管理,科学用水,提高用水效率,最终达到社会效益和经济效益的最大化,实现绿色环保目标.%Through the multiple utilization of pit dewatering, wastewater and rainwater recycling, and the lean management of water resources in the construction process, the water is scientifically used to improve water use efficiency, ultimately achieve the maximization of social benefits and economic benefits and achieve environmental protection goals.
展开▼