根据普朗铜矿破碎硐室的水文地质条件及施工要求,本文提出了一种辅助斜坡道与平导硐加小天井施工相结合的施工方法。该方法优化了施工顺序,降低了劳动强度,加快了施工进度,保证了支护质量,为复杂水文地质条件下的硐室施工提供了成功的经验。%According to the hydrogeological conditions and construction requirements of Pulang copper crusher chamber, this paper puts forward a construction method combing auxiliary ramp and flat enlarged and the small courtyard. By this method, the construction sequence can be optimized, the labor intensity reduced, the construction progress sped up, and the quality of the support ensured, which provides a successful experience for chamber construction under complex hydrogeological conditions.