首页> 中文期刊> 《价值工程》 >浅论热力工程在招标阶段的成本控制

浅论热力工程在招标阶段的成本控制

         

摘要

传统的热力工程项目成本控制,以项目建设过程中造价控制为核心的控制系统,着重对变更、增项的审核。这种系统的局限性在于以工程建设过程为主要对象的管理目标,而弱化了对项目招标阶段的造价审核。为了发挥造价咨询公司在招标阶段对工程造价的积极推动作用,减小因人为误差产生的风险,本文针对热力工程在招标阶段的造价审核,阐述相应工作方法,仅供参考。%The traditional thermal engineering project cost control is the control system taking the cost control in the project construction process as the core, it focuses on the audit of change and increase. The limitation of this system is that the project construction process is the main target of the management objectives, and the project bidding phase of the cost audit is weak. In order to play the positive role of cost consulting firms in promoting the engineering cost in the bidding stage, reduce the risk caused by man-made error, the paper focuses on the thermal engineering cost audit in bidding stage to expound the corresponding working methods and provide references.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号