大倾角综采工作面设备快速撤除一直是煤矿生产的技术难题。本文针对刘庄煤矿121106俯采工作面撤除难题,通过合理优化工作面设备撤除整体路线以及撤除施工工艺,实现了工作面设备的安全快速撤除。%The rapid removal of the equipment on comprehensive large dip angle mining working surface is always the technological problem of coal mine production. Aimed at the removal problem of 121106 bow mining working surface in Liuzhuang Coal Mine, the secure and rapid removal of the equipment on working surface is implemented by reasonably optimizing the overall course of equipment removal of working surface and the technology of removal process.
展开▼