首页> 中文期刊> 《价值工程》 >挂篮悬臂灌注连续梁施工分析与探讨

挂篮悬臂灌注连续梁施工分析与探讨

         

摘要

本文根据沈阳市某跨越铁路连续梁桥梁施工,对连续梁挂篮悬臂灌注梁段施工进行了分析,包括挂篮拼装、挂篮静载试验、梁段循环施工、边跨直线段施工、合龙段施工、挂篮拆除、施工各阶段线形控制要点,为广大连续梁桥梁施工一线技术人员提供参考。%According to a across railway continuous beam bridge construction in Shenyang, this paper analyzed the hanging basket cantilever casting continuous beam construction, including hanging basket assembly, hanging static contains test, beam segment cycle construction, side across line segment construction, closure segment construction, hanging basket demolition, and linear control points in each stage of the construction, providing reference for continuous beam bridges construction of the first-tier technicians.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号