本文以某电厂1000MW机组塔式锅炉水冷壁垂直段组合、安装为例,介绍塔式锅炉水冷壁垂直段组合、安装方案的确定过程,以其成功安装经验,对于同类型锅炉水冷壁安装具有一定借鉴意义。%This paper takes the combination, installation of the water wall vertical portion of 1000MW unit tower-type boiler in a power plant for example to introduce the deterministic process of the combination and installation plans of the water wall vertical portion of tower-type boiler. The successful installation experience of it has certain reference significance for the water wall installation of the similar type boilers.